Professional ASME- certifies Oil&Gas Equipments Supply
CATEGORY
-
NEW UNDERGROUND TEST SYSTEM
-
SURFACE WELL TESTING (SWT)
-
TRAILER WELL TEST PACKAGE
-
HEATING & COOLING
-
OIL- GAS GATHERING & TREATMENT
-
2/3/4 Phase Separator
-
Multitube Cyclone Separator
-
Integrated Three Phase Test Separator with Heater
-
Kettle Type Reboiler (Floating Head Type)
-
Crude Oil Stabilization Tower
-
Crude Oil Storage Tank
-
Natural Gas Dehydration Unit (TEG)
-
Molecular Sieve Adsorption Tower
-
Light Hydrocarbon Recovery Unit
-
Liquified Petroleum Gas Tank(LPG)
-
Oilfield Water Treatment Solution
-
-
DISTRIBUTED CONTROL SYSTEM
-
ANCILLARY EQUIPMENT
MESSAGE
Smokeless Flare Stack
Specification:
Technical parameter:
1) Fuel types: oil and gas
2) Gas pressure: ≤0.1 MPa,14.5psi or less
3) Gas inlet test pressure: 0.4 MPa,58psi
4) Largest gas consumption: 1000m3/ h
5) Power supply: AC220V. 50HZ 3A(Max)
6) Electric ignition voltage: 10 KV (Max)
7) Electric ignition energy storage : 150MJ
8) Spark frequency: ≥5HZ
9) Flame detector response time: ≤5S
10) Working temperature: the head of the ignition device (flame outlet within the range of 2m, max 600℃, 1112°F); the other parts -25℃--60℃, -13°F--140°F
11) Electrical insulation performance: ≥2MΩ(normal condition, the insulation resistance between the ignition device shell and the power input)
12) Test conditions: AC500V 50HZ.
Schematic diagram:
Features:
1) Safe design with low maintenance and long service life;
2) Fuel efficient pilot burners;
3) Very low noise levels;
4) Proven designs;
5) Quick and simple installation;
6) Third-party certification of environmental performance;
7) Fallout-free and smokeless combustion;
8) Built in shutoff valve for fallout prevention;
9) Integral design of water screens;
Advantages:
1) Minimal noise;
2) Minimal heat radiation;
3) Suitable where liquid contents are more in a flare gas;
4) Ease of emmissions sampling and testing;
5) Reduces environmental impact during well testing;
6) Accommodates low oil flow rates and adverse wind conditions;
7) Extremely high destruction efficiency.
Application:
Exploration and development well testing and cleanup operations
Operations in environmentally sensitive areas offshore and onshore
Heavy and waxy oil production
- Relevant Case
- Related Products
PRODUCTS
CONTACT US
Tel:+86-18337966423
Email:sales@lrcoilequipment.com
Add:No. 1, Weiliu Road, Luoyang City, Henan, P.R.C.