Professional ASME- certifies Oil&Gas Equipments Supply
CATEGORY
-
NEW UNDERGROUND TEST SYSTEM
-
SURFACE WELL TESTING (SWT)
-
TRAILER WELL TEST PACKAGE
-
HEATING & COOLING
-
OIL- GAS GATHERING & TREATMENT
-
2/3/4 Phase Separator
-
Multitube Cyclone Separator
-
Integrated Three Phase Test Separator with Heater
-
Kettle Type Reboiler (Floating Head Type)
-
Crude Oil Stabilization Tower
-
Crude Oil Storage Tank
-
Natural Gas Dehydration Unit (TEG)
-
Molecular Sieve Adsorption Tower
-
Light Hydrocarbon Recovery Unit
-
Liquified Petroleum Gas Tank(LPG)
-
Oilfield Water Treatment Solution
-
-
DISTRIBUTED CONTROL SYSTEM
-
ANCILLARY EQUIPMENT
MESSAGE
Skid Test Separator with Heater (DCS System)
Specification
We adapt a range of autonomous technology to design & fabricate equipments. The unit passed the technical evaluation and assessment for Changqing oilfield exploration bureau in 1994 in China; Also passed SINOPEC technical expert testimony in 2002; Also achieve a award for scientific and technological advancement in 2003. After more than a decade of applications and constantly improve, we have a good feedback on product quality, saving energy and reducing consumption, reducing investment and technical services by our customers.
Technical parameters:
1) Model state: For “LRC A/B” , “LRC” means products series mark: “ A ” means gas handling capacity per day: A *104 m3n/d; “ B ” means liquid handling capacity perday: Bm3/d.
2) Design pressure for heating coil in heaterMax : 32Mpa (4640psi)
3) Design pressureMax: 9.8Mpa(1400psi)
4) Normal operate pressureMax: <7.5Mpa (1088psi)
5) Inlet pressureMax: 32.0Mpa(4640psi)
6) Inlet temperature: ≥10℃(50°F)
7) Safety valve set pressure: 7.5Mpa(HP)(1088psi)、
1.3Mpa(LP)(200psi) (Details see nameplate).
8) Rupture Disc set pressure: 9.4Mpa (1363psi)
9) Gas Flow Measure precision: ±1%
10) Overall dimensions (L×W×H):
7.4×2.2×2.5m(24×7×8inch)(When chimney is down)
11) Power supply: 220VAC, 10A
12) Inlet & outlet connection type: Thread type, following are size: Gasinlet: DN2?”
Gasoutlet: DN2?”
Oil & Water outlet: DN2?”
Integrated Three Phase Test Separator with Heater Series Sheet
Technical parameters Model | Gas handling capacity per day | Liquid handling capacity per day | Structure | Monitoring mode | Dimension(M) |
Weight(T) |
LRC25/50 |
25 | 50 |
Integrated |
IPC control |
7.2×2.2×2.4 |
11.2 |
LRC25/100 |
25 | 100 |
Integrated |
IPC control |
7.4×2.2×2.4 |
11.5 |
LRC30/50 |
30 | 50 |
Integrated |
IPC control |
7.5×2.2×2.4 |
12.1 |
LRC30/100 |
30 | 100 |
Integrated |
IPC control |
7.6×2.2×2.4 |
12.5 |
LRC50/50 |
50 | 50 |
Integrated |
IPC control |
8.1×2.2×2.4 |
13.5 |
LRC50/100 |
50 | 100 |
Integrated |
IPC control |
8.6×2.2×2.4 |
13.8 |
LRCF30/2B |
30 | 200 |
Separated |
IPC control |
14.9 | |
LRCF50/2B |
50 | 200 |
Separated |
IPC control |
15.8 | |
LRCF30/3B |
30 | 300 |
Separated |
IPC control |
16.4 | |
LRCF50/3B |
30 | 300 |
Separated |
IPC control |
17.9 | |
LRCF-X |
<30 | >300 |
Separated |
IPC control |
Special design |
Schematic Diagram
Features:
- Inlet flow separation
- Coriolis-based mass-flow measurement of produced liquids
- Integral micro-process control and data acquisition with real-time job surveillance and reporting
Application condition:
Over decade of research and development, LRC series 3phase separating & metering unit currently has more than a dozen varieties. Now it can meet the various requirements for oil and gas fields of test and production.
In China, the unit has been put into use in the Changqing gas field since 1990 and it is successfully operated for nearly ten years. Currently, there are more than 40 sets of eauipments in Changqing oilfield, Dagang oilfield, Qinghai oilfield Daqing oil field, and our customers have achieved good economy profits and social benifits.
- Relevant Case
- Related Products
PRODUCTS
CONTACT US
Tel:+86-18337966423
Email:sales@lrcoilequipment.com
Add:No. 1, Weiliu Road, Luoyang City, Henan, P.R.C.